JSM Group

Invicta worked very well despite the nature of the project (not in Invicta’s control) which meant different trades had to work around each other often demobilising and remobilising.

JN

Project Name: O2 Finchley 11kV installation

Project Location: London

Scope Of Works: Installation of four 150mm Durasteel tubes, through 100m of tunnel with 8 turning boxes

Customer Service
Technical or commercial queries were answered swiftly and seamlessly: 9/10

Installation Project Management
The project was executed on-site in a professional, safe & timely manner: 8/10

Expectations
Invicta’s final solution met my initial project requirements & expectations: 10/10

Overall
How would you rate the overall level of service received? 9/10

Any notable areas of exceptional service: Invicta worked very well despite the nature of the project (not in Invicta’s control) which meant different trades had to work around eachother often demobilising and remobilising.

Any specific areas for improvement: None

For your information

You are being redirected to one of our divisional subsites which contains more detailed information on the required division. To navigate back to the main Invicta Group site, please click the link found in the footer at the bottom of the page.