Durasteel Archival Vault Construction

Step 1 - Steelwork Construction
Section of standard basetrack detail shown.

Step 2 - Durasteel Panels
Skeleton framework of vault prior to fixing of Durasteel panels and insulation shown.

Step 3 - Insulation
Insulation to internal core of walls is installed at this stage.

Step 4 -
Fireboard (Interior)
15mm thick Gypsum fireboard applied to the interior of the vault to allow for required finish.

Step 5 - Roof Construction
Typical Durasteel ceiling shown.

Step 6 - Mobile Shelving
Mobile shelving units installed into vault to maximise storage capacity.

Step 7 - The Finished Vault
A 4 hour fire rated, seismic proof, blast and impact resistant vault for the secure storage of data.